Investigation report on "July 14, 2021" electric shock accident in the construction site of Longpanhe Park Phase III project in Chuzhou City

At 10: 51 on July 14, 2021, an electric shock accident occurred at the construction site of the third phase project of Longpanhe Park in Chuzhou City, resulting in the death of one worker.

According to the Regulations on the Reporting, Investigation and Handling of Production Safety Accidents (Order No.493 of the State Council) and Articles 18 and 19 of the Measures for the Reporting, Investigation and Handling of Production Safety Accidents in Anhui Province (Order No.232 of the Provincial Government), the Chuzhou Municipal People’s Government authorized the Municipal Emergency Management Bureau to organize the establishment of a unit headed by the Municipal Emergency Management Bureau. The "July 14th, 2021" electric shock accident investigation team (including comprehensive team, technical team, management team and emergency response evaluation team) on the construction site of the third phase project of Longpanhe Park in Chuzhou City, which is composed of the Municipal Public Security Bureau, the Municipal Federation of Trade Unions and the Municipal Housing and Construction Bureau, and invited representatives from the Municipal Supervision Commission to participate (the signature list is attached). In accordance with the principles of "four no-misses" and "scientific rigor, compliance with laws and regulations, seeking truth from facts and paying attention to practical results", the investigation team, with the active cooperation of relevant departments and units, found out the course, cause, casualties and direct economic losses of the accident through field investigation, investigation and evidence collection, consulting relevant personnel, identified the nature and responsibility of the accident, put forward treatment suggestions, and formed "Longpan, Chuzhou City" The accident investigation is now reported as follows:

I. Basic information

(a) the general situation of the project and the bidding situation

1. General situation of the project

The third phase project of Longpanhe Park was approved by Chuzhou Development and Reform Commission with the document of Chu Development and Reform Examination and Approval (2020) No.229. The construction project starts from Jinpu Railway in the east and ends at Yangming Road in the west. The base is about 1,655 meters long and 50-270 meters wide. The project covers a total area of about 252,000 square meters, including 200,000 square meters of garden landscape and 50,000 square meters of water area. The south side of the project is basically commercial residential land, and the north side will build new roads according to the planning requirements. The design and construction contents: garden landscape, water conservancy flood control and drainage facilities, ancillary buildings, night lighting, weak current system, etc., including management room and No.1 and No.2 public toilets (construction area of 2038 square meters).

2. Bidding situation

(1) On November 26th, 2020, Chuzhou Key Project Construction Management Office made public bidding for Longpanhe Park Phase III project; On December 22, 2020, the project was opened, and Jiangsu Kaijin Ecological Environment Co., Ltd. (the leader of the consortium) and Anhui Shui Mu Construction Engineering Group Co., Ltd. won the bid, with the winning price of eight thousand Wu Bai three hundred and seventy-nine million and fifty-seven yuan and sixty-one cents (¥: 85,370,957.61 yuan), and the winning period was from January 23, 2021 to June 17, 2022.

On February 6, 2021, Jiangsu Kaijin Ecological Environment Co., Ltd. and Anhui Shui Mu Construction Engineering Group Co., Ltd. signed a consortium agreement. Among them, the agreement stipulates: "3. The consortium will submit the bidding documents in strict accordance with the requirements of the bidding documents, perform the contract, and bear joint and several responsibilities externally"; "4. The internal division of responsibilities of each member unit of the consortium is as follows: Jiangsu Kaijin Ecological Environment Co., Ltd. is responsible for hosting the bidding and contract implementation stage, and is responsible for material procurement, engineering construction until it is qualified for completion and acceptance, and warranty during the defect liability period; Anhui Shui Mu Construction Engineering Group Co., Ltd. is responsible for the cooperation and coordination in the contract implementation stage, except for the landscaping construction quantity, until the completion acceptance and the warranty during the defect liability period.

On February 20th, 2021, Chuzhou Key Project Construction Management Office, Jiangsu Kaijin Ecological Environment Co., Ltd. and Anhui Shui Mu Construction Engineering Group Co., Ltd. signed the Landscaping Project Construction Contract (GF-2020-2605) for Longpanhe Park Phase III project.

In March, 2021, introduced by the builder of the project department, the Longpanhe Park Phase III project department subcontracted the construction of two public toilets and management rooms in Longpanhe Park Phase III project No.1 and No.2 to natural person Liu Mouqiang (male, XX, Group X, Village X, Village X, Xinshao County, Hunan Province, ID number: 4305221987XXXXXXXX). Subsequently, Liu Mouqiang and partner Liu Moudong found Duan from the local area. On July 4th, due to problems such as unqualified construction quality, Longpanhe Park Phase III Project Department ordered it to leave. After that, Liu Mouqiang organized workers to collect materials, clean up the scene and prepare to leave.

(2) On November 26th, 2020, Chuzhou Key Project Construction Management Office made public bidding for the supervision of Longpanhe Park Phase III project (the second time). On January 27, 2021, the project was opened and won by Jiangsu Open Source Engineering Consulting and Supervision Co., Ltd. On February 2, 2021, the bid-winning notice was issued, and the bid-winning price was 48.2% of the price standard stipulated in the Notice of the Ministry of Construction of the National Development and Reform Commission on Printing and Distributing the Provisions on the Management of Construction Project Supervision and Related Fees (No.670 [2007] of the Development and Reform Commission). The bid-winning period (supply period) was from February 3, 2021 to 2022.

On February 6, 2021, Chuzhou Key Project Construction Management Office and Jiangsu Open Source Engineering Consulting and Supervision Co., Ltd. signed the Construction Project Supervision Contract (GF-2012-0202) for Longpanhe Park Phase III Project.

(two) the accident related units and individuals.

1. Construction management unit

(1) Chuzhou Key Project Construction Management Office (hereinafter referred to as "Key Office"), with unified social credit code: 123411005532839441; Type: fully funded institutions; Address: Jianshe Building, Langya West Road, Chuzhou City; Legal Representative: Zhang; Start-up capital: 1.288 million yuan, valid from March 27, 2019 to March 27, 2027; Purpose and business scope: responsible for the organization, implementation, coordination and management of urban infrastructure projects invested by the government at the same level, public welfare social projects and other key projects designated by the municipal government; Responsible for on-site management and coordination, project quality, safety production, technical file management, disbursement of funds according to project progress, preparation of project final accounts, completion report and participation in project completion acceptance. According to the Notice of the Office of Chuzhou Municipal People’s Government of the Office of Chuzhou Municipal Committee of the Communist Party of China on Adjusting the Function Allocation, Internal Organizations and Staffing of Chuzhou Key Project Construction Management Office (Chu Ban Zi [2019] No.58), the key offices are composed of: comprehensive planning department, comprehensive coordination department, engineering construction department I, engineering construction department II, engineering construction department III, engineering supervision department, public utilities department and municipal landscape management center, municipal facilities management center, and so on. Among them: Ding Moming, member of the leading party group of the key department and director of the municipal facilities management center, is in charge of the public utilities department and the above three management centers.

After the signing of the construction contract for the third phase of Longpanhe Park, the city landscape management center will be responsible for the specific work. In February, 2021, the City Landscape Management Center arranged for Wang Mogu, the chief of the Engineering and Technology Section, to be stationed at the third phase project site of Longpanhe Park, and to exercise the owner’s management duties on behalf of key departments.

(2) Unified social credit code of Chuzhou Landscape Management Center (hereinafter referred to as "Garden Center"): 12341100486089323D;; Type: fully funded institutions; Address: 8th Floor, Forestry and Landscape Bureau, No.81 Huayuan West Road, Chuzhou City; Legal Representative: Fang Mougou; Start-up capital: 7.26 million yuan, valid from January 15, 2020 to January 15, 2025; Purpose and business scope: urban landscaping construction and management.

2. The consortium contractor

(1) Jiangsu Kaijin Ecological Environment Co., Ltd. (hereinafter referred to as "Kaijin Company"), unified social credit code: 91320115733176855B(1/9), type: limited liability company, domicile: No.8 Shuige Road, Jiangning Economic and Technological Development Zone, Nanjing, legal representative: Zhang, registered capital: 110 million yuan only, date of establishment. Construction of ancient garden buildings; Municipal engineering construction; Building decoration, etc. It has the qualification certificate of construction enterprise, with the certificate number of D332071428, and the validity period: February 5, 2021 (Note: Notice of the General Office of the Ministry of Housing and Urban-Rural Development on Relevant Matters Concerning the Qualification Extension of Construction Engineering Enterprises (J.B.H. [2020] No.334): the validity period of relevant qualification certificates is extended to December 31, 2021); Qualification category and grade: general contracting of construction engineering, general contracting of water conservancy and hydropower engineering, general contracting of municipal public works, professional contracting of ancient architecture engineering, professional contracting of urban and road lighting engineering and professional contracting of environmental protection engineering; Hold the safety production license: (Su) JZ Anxu Zhengzi [2007]010917, valid from May 5, 2019 to May 4, 2022.

On March 2, 2021, Kaijin Company established Longpanhe Park Phase III Project Department (hereinafter referred to as Longpanhe Project Department) with the document of Kaijin Eco-herringbone [2021] No.04. The company appointed Li Mounan as the project manager (builder’s certificateNo.: Su 23211XXXXXXXX, valid until January 8, 2023; Project leader’s safety qualification certificate number: Su Jian ‘an B (2017) 050xxxxx, valid until February 24, 2023), technical leader Pan Mouhua, safety officer Chen Mou Yu (safety production management personnel certificate number: Su Jian ‘an C2 (2020) 002xxxxx, valid until October 23, 2023), and quality controller Dong Mounan, with information. Office of the Project Department: south of the intersection of Longpan River and Jinling Road, Chuzhou City. At the end of March 2021, the project department entered the site and started construction. During the construction period, Chen Mou Yu, the full-time safety officer determined during the bidding, was responsible for data sorting in the project department, and Xu Moucheng, the safety officer actually responsible for safety management at the site, had no safety officer qualification certificate.

On June 1, 2021, Kaijin Company hired a natural person Cheng Mou (without the qualification certificate of safety production management personnel) to take charge of the accident site management. By the time of the incident, the two parties had not signed an employment agreement.

(2) Anhui Shui Mu Construction Engineering Group Co., Ltd. (hereinafter referred to as "Shui Mu Company"), unified social credit code: 91341125394205374C(1-1), type: limited liability company (invested or controlled by a natural person), domicile: Floor 1, JD.COM International Building, Dingyuan County, Chuzhou City, Anhui Province, legal representative: Wei Mochun, registered capital:. Special design of engineering design, architectural decoration, building curtain wall, building intelligence, lighting and fire protection facilities in the construction industry; -urban landscaping, etc. Having the qualification certificate of construction enterprise,No.: D234061897, and the validity period: December 21, 2022; Qualification category and grade: Grade II general contracting of building engineering, Grade II specialized contracting of waterproof, anticorrosion and thermal insulation engineering, Grade II specialized contracting of building curtain wall engineering, Grade II specialized contracting of building decoration and decoration engineering, Grade II general contracting of municipal public works. Hold the safety production license: (Wan) JZ Anxu Zhengzi [2016]002407, valid from August 30, 2019 to August 29, 2022.

3. Supervision unit

Jiangsu Open Source Engineering Consulting and Supervision Co., Ltd. (hereinafter referred to as "Open Source Company"), unified social credit code: 9132000060895833XB(1/4), type: limited liability company, domicile: Building 08, Dingshan Urban Industrial Park, Pukou District, Nanjing, legal representative: Wang Mouhuai, registered capital: 10 million yuan, date of establishment: 1995. General project management services; Bidding agency services, etc. The company holds the qualification certificate of engineering supervision, the certificate number is E132003824-4/1, and the validity period is June 27, 2023; Business scope: Grade A of housing construction engineering supervision and Grade A of municipal engineering supervision, and can carry out project management and technical consultation of corresponding similar construction projects.

On February 20th, 2021, the open source company established the "Longpanhe Park Phase III Project Supervision Department" with Su Kaiyuan [2021] No.07 (hereinafter referred to as the Longpanhe Project Supervision Department). The project director is Zheng Yeming (the registered practice certificate number of supervision engineer is 3400XXXX, and the registered major is housing construction engineering and municipal public works, and the validity period is until May 10th, 2024; Professional supervision engineer Hu Mohong (supervision engineer certificate number: 2101JL00000XXXXX, valid until May 10, 2024), professional supervision engineer Wang (supervision engineer certificate number: Su Jian Jian Jian zhuan 20200XXXXX), witness Wang (witness certificate number: JZJN(2020)0XXXXX).

(3) Information on administrative licensing

After investigation, the third-phase construction project of Longpanhe Park in Chuzhou City is a key project of the municipal government in 2021. When applying for land use approval, it coincides with the decentralization of land approval authority from the provincial level to the municipal level, so the construction permit has not yet been obtained.

(four) the scene of the incident

The accident occurred in the construction enclosure area on the south side of the intersection of Longpanhe Park and Ziwei Road. The east side of the accident site is the construction area fence, the west side is the open space, the south side is the Ziwei Tianyue community fence, and the north side is the prefabricated house (which was rented by Liu Mouqiang and Liu Moudong when they entered the site in April, and was used as a resting place for Liu Moudong’s daily care site materials and a temporary Chinese dining hall for workers). The south side of the prefabricated house was equipped with an outdoor air-conditioning host, and the deceased was lying in the east with one hand broken. The cable is connected from Ziwei Tianyue Community on the south side of the construction area (see Figure 3).

 

Figure 1 Site Plan Location Map

Figure 2 Accident scene map

Fig. 3 wiring diagram

(five) the situation of the dead

Liu Modong, male, Han nationality, 43 years old, natural person, home address: XX, Group X, a village in Muchuan County, Leshan City, Sichuan Province, ID number: 5111291978XXXXXXXX, who lives in the prefabricated house on the construction site every day, is responsible for on-site management and care of materials and cooking, and was electrocuted in the accident.

(6) Weather conditions

According to the investigation, on July 14th, Chuzhou was sunny and cloudy, with the lowest temperature of 26 degrees Celsius and the highest temperature of 37 degrees Celsius. The southerly wind changed from 3-4 to 1-2, and the relative humidity was 0.91%.

Second, after the accident

As only one person was present at the scene when the incident occurred, it was impossible to know the scene conditions at the time of the incident by asking others. Only by reading the video data of the monitoring probe on the wall of Ziwei Tianyue Community in the south of the incident site, the situation at the time of the incident can be restored:

At 10: 34 a.m. on July 14th, 2021, three workers packed up materials, tools and other sundries on the west side of the prefabricated house. Liu Moudong was naked and wearing slippers to watch, and then returned to the prefabricated house. The three workers also left the scene successively.

At 10: 36: 29, Liu Moudong went to the accident site on the south side of the prefabricated house to check the cable situation (according to the investigation, on the morning of the accident, an excavator passed by the south side of the prefabricated house, which may have broken the cable on the ground). At that time, two workers also walked nearby, suspected to discuss the power failure of the cable. Subsequently, Liu Moudong returned to the board room and took the electrician’s pliers, and connected the electricity at the broken end of the cable. When the electricity was connected, he was shocked by the current. After the connection, Liu Moudong returned to the movable board room; During the period, two workers watched the electricity connection, and then they also entered the movable board room;

At 10: 41: 56, two workers left the prefabricated house;

At 10: 43: 29, Liu Moudong came out of the prefabricated room, holding a vise and a red plastic bag in his hand, came to the broken line, wrapped his hand in a plastic bag, and began to connect the cable. During this period, he was shocked twice and returned to the prefabricated room after the connection;

At 10: 46: 40, Liu Moudong came out of the movable board room again and connected the electricity to the broken end of the cable again;

At 10: 50: 11, a worker dressed in black came to the scene and stood by to watch Liu Moudong connect the electricity; At 10: 50: 24, the worker left the scene;

At 10: 51: 27, Liu Moudong was shocked to the ground when he bent down to connect the cable again, and never stood up again. At this time, no one else was seen at the scene.

At about 11 o’clock, workers Duan Mocai and Wang Mogen of the project department cleared the scene at the construction site of the third phase of Longpanhe Park on Fengyang North Road. The main job was to tidy up the steel pipes. At 11 o’clock in the morning, the two came to the construction site and prepared to have lunch in the prefabricated room (usually the prefabricated room is used as a canteen, and the deceased Liu Moudong is responsible for making lunch). Entering the room from the door on the north side of the prefabricated house, Liu Moudong was not found (normally, Liu Moudong would cook meals in the prefabricated house at this time) and the air conditioner in the room was not turned on. Duan only walked to the south side of the prefabricated house, and he saw Liu Moudong lying on his back on the ground 5 or 6 meters away from the prefabricated house. He walked in and saw Liu Moudong holding a black wire under his head with his left hand, and his right hand was naturally stretched out beside him. The whole person was pale and pale. Later, Duan used a stick to pick up the wire from Liu Moudong and cut off the power, and called 120 emergency number (the time was 11:07). The 120 ambulance arrived at the scene soon. After examination by the emergency doctor, the injured person had no vital signs and was declared dead. Duan Mou called 110 again. Soon, the Chuzhou Public Security Bureau rushed to the scene by the police of Wenfeng Road Police Station of the Development Zone Branch to investigate the scene and bring the relevant personnel to the police station for inquiries.

Iii. Emergency Response and Rescue of Accidents

After the accident, at 11: 08 am, Liu Mouqiang, who was returning the rented steel pipe outside, immediately took a taxi to the scene of the accident after receiving a phone call from Wang; At 11: 20, Liu Mouqiang called Liu Mouqing (180XXXX9100), the budget officer of the project department, to report the accident. After Liu Mouqiang arrived at the scene of the accident, Cheng Mou, the person in charge of the project department, Ni Mou, the material buyer of the team, and other personnel had arrived at the scene. At that time, the 120 ambulance had gone back, but the 110 police were still on the scene. Subsequently, the forensic doctor rushed to the scene to conduct an on-site autopsy. Subsequently, the police informed the funeral home to transport the deceased to the funeral home, and Liu Mouqiang went to the funeral home with the car to sign.

At 15: 54 on the same day, Hang Moupeng, director of the key department, received a WeChat from Dou Mouwen, the municipal government office, asking whether there was an accident in the third phase of Longpanhe Park. Hang Moupeng transferred the WeChat to Ding Mouming, member of the Party Committee of the key department and director of the municipal facilities management center (in charge of the public utilities department and the garden landscape management center of the key department), asking him to verify the accident. Ding Mouming, who was in a meeting, asked Fang Mougou, director of the Landscape Management Center, about the accident at the first time. Fang Mougou replied that he didn’t know the accident either, so Ding Mouming asked Fang Mougou to rush to the scene to understand the accident. After the meeting, he rushed to the Longpan River Project Department at 16: 25, and called the supervision department of the key department on the way to ask them to rush to the Longpan River Project Department. At 15: 58, on the way to the Longpan River Project Department, Wang Mougu received a phone call from Zhang Mouru, the public utility department of the key department, saying that something had happened to the third phase of the Longpan River Park, and Wang Mougu rushed to the project department. Other relevant personnel also rushed to Longpanhe Project Department after learning the information. After understanding the preliminary situation of the accident, Li Mounan reported to Wang Mogu. After Ding Moming arrived at the scene, he asked to set up a special work class immediately: one is to inquire about the accident in detail, and the other is to urge the project department to do a good job in the aftermath. At the same time, Ding Mouming arranged for Zhang, deputy director of the office of the Garden Landscape Management Service Center, to report the accident to the Municipal Emergency Bureau, and Zhang Jun telephoned the Municipal Emergency Bureau at 16: 59.

After receiving the accident report, the relevant leaders of the Municipal Emergency Management Bureau led the relevant personnel to rush to the scene of the accident, investigate the scene of the accident and guide the aftermath of the accident.

On July 17th, Kaijin Company reached a compensation agreement with the family of the deceased. The aftermath of the accident was handled in a timely manner, and there was no incident that affected social stability.

From the process of this emergency response, Longpanhe Project Department’s post-site protection was good, but the site was not properly handled, the emergency plan was not started in time, and the information was not submitted in time.

Fourth, the accident losses

One person was killed in the accident, and the direct economic loss was about 1.9 million yuan.

V. Cause of the accident

(A) the direct cause

1. When temporary electricity is connected, it is directly connected from the lower opening of the electric meter, without leakage protector and safety protection measures;

2. Liu Moudong’s safety awareness was weak, and he did not have an electrician’s operation certificate. Without taking corresponding insulation protection measures, he repeatedly violated the rules and risked live working, which eventually led to the accident.

(2) Indirect causes

1. Kaijin Company failed to implement the main responsibility for production safety, and entered the site for illegal construction without a construction permit; Inadequate supervision and inspection of the safety production work of Longpanhe Park Phase III Project Department; There are some problems in the project department of Longpanhe Park Phase III, such as ignoring the package and chaotic on-site safety management.

2. Shui Mu Company, as a member of the consortium, failed to implement the main responsibility of production safety, and failed to supervise and inspect the production safety work of Longpanhe Park Phase III Project Department.

3. The open source company failed to implement the supervision responsibility, failed to stop the illegal construction of the contractor without a construction permit, and failed to report to the competent department; Failing to effectively urge the construction party to strengthen on-site safety management, failing to find out the potential safety hazards of temporary electricity consumption on the construction site in time and urging the rectification in place.

4. The key points failed to seriously fulfill the owner’s safety management responsibilities, the project construction did not have a construction permit, and the safety hazards such as temporary electricity consumption in the project were overlooked.

VI. Nature of the accident

After investigation, it was found that this was a general production safety accident.

Seven, accident responsibility identification and treatment suggestions

(1) Persons exempt from accountability

Liu Modong, male, Han nationality, 43 years old, is a natural person. He lives in the prefabricated house on the construction site every day, and is responsible for on-site management and taking care of materials and cooking. He has a weak sense of safety, and illegally connects temporary power lines. Without taking corresponding insulation protection measures, he has repeatedly ventured to work with electricity, which eventually leads to electrocution and is directly responsible for the accident. In view of his death in the accident, it is suggested that he should not be held accountable.

(2) Suggestions on handling the persons responsible for the accident.

1. Cheng Mou, male, 40 years old, ID number: 3401221971XXXXXXXX, the site manager of Longpanhe Park Phase III project of Jiangsu Kaijin Ecological Environment Co., Ltd., failed to manage the safety of the project site, lacked the investigation and management of hidden dangers, and the hidden safety hazards existed for a long time; If the accident is not reported to the project department in time, the main management responsibility shall be borne for the accident. The above acts violate the provisions of Article 22, paragraph 5, Article 23 and Article 80 of the Law of People’s Republic of China (PRC) on Work Safety (Decree No.13 of the former President of the State), and it is suggested that the project department of Longpanhe Park Phase III be dismissed and removed from the scene.

2. Li Mounan, male, 31 years old, ID number: 3403211990XXXXXXXX, project manager of Longpanhe Park Phase III project of Jiangsu Kaijin Ecological Environment Co., Ltd., the first person in charge of safety production in the project department, failed to perform the statutory safety production management duties and entered the site for illegal construction without a construction permit; Inadequate supervision and inspection of the project site, inadequate safety management, and long-standing security risks; The education and training of employees is not in place, and there is a phenomenon of "three violations"; Failing to carry out emergency plan drills as required, and taking the main management responsibility for the accident. The above acts violate the provisions of the second, fourth and fifth paragraphs of Article 22 and Article 23 of the Law of People’s Republic of China (PRC) on Work Safety (Decree No.13 of the former President of the State). According to Item (1) of Article 45 of Measures for Administrative Punishment of Illegal Acts in Work Safety (Order No.15 of the State Administration of Work Safety, as amended by Order No.77), it is suggested to impose a fine of 9,000 yuan.

3. Zhang, male, 45 years old, ID number: 3201211976XXXXXXXX, legal representative of Jiangsu Kaijin Ecological Environment Co., Ltd., the first person in charge of production safety, failed to perform the statutory duties of production safety management, and entered the site for illegal construction without a construction permit; Failing to supervise and inspect the safety production work of the third phase project department of Longpanhe Park, and taking the main leadership responsibility for the accident; After the accident, if it is not reported to the municipal emergency management department and the department responsible for safety supervision within the prescribed time limit, it shall be directly responsible for the late repayment of accident information. The above acts violate the provisions of Article 5, Paragraph 5 and Paragraph 7 of Article 18 of People’s Republic of China (PRC) Law on Work Safety (Decree No.13 of the former President of the State). According to the second paragraph of Article 106 of the Law of People’s Republic of China (PRC) on Work Safety (Decree No.13 of the former President of the State), it is suggested that it should be fined 70% of its annual income of two hundred and ten thousand yuan (210,000 yuan) in the previous year, totaling one hundred and forty-seven thousand yuan (147,000 yuan).

4. Wei Mochun, male, 35 years old, ID number: 3401041986XXXXXXXX, legal representative of Anhui Shui Mu Construction Engineering Group Co., Ltd., the first person in charge of safety production, failed to perform the statutory safety production management duties, neglected to supervise and inspect the safety production work of Longpanhe Project Department, and should bear the leadership responsibility for the accident. The above acts violate the provisions of Article 5 and Paragraph 5 of Article 18 of People’s Republic of China (PRC) Law on Work Safety (Decree No.13 of the former President of the State). According to the provisions of Article 92 of the Law of People’s Republic of China (PRC) on Work Safety (Decree No.13 of the former President of the State), it is suggested that it should be fined 30% of its annual income of 140,000 yuan (140,000 yuan) in the previous year, totaling 52,000 yuan (52,000 yuan).

5. Zheng Moming, male, 37 years old, ID number: 3411021984XXXXXXXX, chief supervision engineer of Longpanhe Park Phase III project of Jiangsu Open Source Engineering Consulting and Supervision Co., Ltd., failed to strictly perform supervision duties, and failed to stop the illegal construction of the construction unit without a construction permit and did not report to the competent department; Oversight of the on-site security officer’s taking up his post without a license and regardless of the package; Failing to find and eliminate the major safety risks and hidden dangers in the construction in time, it should bear the main supervision responsibility for the accident. The above acts violate the provisions of Article 32 of the People’s Republic of China (PRC) Construction Law, Article 14 of the Regulations on the Administration of Work Safety in Construction Projects and Item (1) of Article 45 of the Measures for Administrative Penalties for Violations of Work Safety (revised by Decree No.15 and Decree No.77 of the former State Administration of Work Safety). According to Item (1) of Article 45 of Measures for Administrative Punishment of Illegal Acts in Work Safety (Order No.15 of the former State Administration of Work Safety, as amended by Order No.77), it is suggested to impose a fine of Qian Lu Yuan (6,000 yuan).

6. Wang Mouhuai, male, 59 years old, ID number: 3201071962XXXXXXXX, the legal representative of Jiangsu Open Source Engineering Consulting and Supervision Co., Ltd., failed to strictly perform the statutory supervision duties, and did not stop the illegal construction of the construction unit without a construction permit and did not report to the competent department; The supervision department of the third phase project of Longpanhe Park neglected to supervise and inspect the production work, and should bear important supervision responsibility for the accident. The above acts violate the provisions of Article 38 of the People’s Republic of China (PRC) Law on Work Safety (Decree No.13 of the former President of the State), Article 32 of the People’s Republic of China (PRC) Construction Law and Article 14 of the Regulations on the Administration of Work Safety in Construction Projects. According to the provisions of Article 92 of the Law of People’s Republic of China (PRC) on Work Safety (Decree No.13 of the former President of the State), it is suggested to impose a fine of 30% of its annual income of one hundred and twenty thousand yuan (120,000 yuan) in the previous year, totaling thirty-six thousand yuan (36,000 yuan).

7. Wang Mogu, male, 40 years old, ID number: 3403221981XXXXXXXX, chief of engineering technology department of Chuzhou Landscape Management Center, representing the key project construction management office of Chuzhou City, as the representative of the owner of Longpanhe Park Phase III project, failed to seriously fulfill the owner’s safety management responsibility and handle the construction permit in time; Oversee the hidden dangers such as temporary power consumption in the project, and be responsible for the management of accidents. It is suggested that the municipal key project construction management office should deal with it according to the cadre management authority.

(three) suggestions on the handling of the relevant responsible units

1. Jiangsu Kaijin Ecological Environment Co., Ltd., the lead contractor of Longpanhe Park Phase III project consortium, failed to seriously perform the statutory main responsibility of production safety, and entered the site for illegal construction without a construction permit; Failing to establish a system for investigation and management of hidden dangers in production safety; The project department of the third phase of Longpanhe Park illegally subcontracted the project to natural persons; The full-time safety management personnel of the project department are insufficient, the on-site safety officer is on duty without a license, and the on-site management is lacking; The "three-level" safety education and training of employees is not in place, and the coverage is not complete. Employees work at their posts without safety assessment; Daily safety inspection and hidden danger investigation and management go through the motions, and the hidden danger of temporary electricity consumption exists for a long time; Failing to carry out emergency plan drills as required; Failing to report to the emergency management department, the housing construction department and the owner within 1 hour after the accident, and bearing the main management responsibility for the occurrence of the accident and the late report of the accident. The above acts violate the provisions of Articles 4, 25, 38, 41 and 80 of the Law of People’s Republic of China (PRC) on Work Safety (Decree No.13 of the former President of the State). According to the provisions of Article 109 of the Law of People’s Republic of China (PRC) on Work Safety (Decree No.13 of the former President of the State), it is suggested to impose a fine of 340,000 yuan.  

2. Jiangsu Open Source Engineering Consulting and Supervision Co., Ltd. failed to strictly perform its engineering supervision duties and failed to stop the illegal construction of the project without a construction permit in time; Failing to effectively urge the construction party to strengthen on-site safety management, failing to timely discover and urge the rectification of long-standing safety hazards on the construction site; The supervisor failed to find out in time that the full-time security officer on the construction site was on duty without a license, and was responsible for the accident. The above acts violate the provisions of Article 32 of the People’s Republic of China (PRC) Construction Law, Article 14 of the Regulations on the Administration of Work Safety in Construction Projects and Item (1) of Article 45 of the Measures for Administrative Penalties for Violations of Work Safety (revised by Decree No.15 and Decree No.77 of the former State Administration of Work Safety). According to Item (1) of Article 45 of Administrative Punishment Measures for Illegal Acts in Work Safety (Order No.15 of the former State Administration of Work Safety, as amended by Order No.77), it is suggested to impose a fine of 20,000 yuan (20,000 yuan).

3. Anhui Shui Mu Construction Engineering Group Co., Ltd., one of the contractors of Longpanhe Park Phase III project consortium, failed to seriously perform the statutory main responsibility of production safety, failed to supervise and inspect the investigation and management of hidden dangers in production safety in Longpanhe Park Phase III project department, and was responsible for the accident. The above acts violate the provisions of Item (1) of Article 45 of the Measures for Administrative Punishment of Violations of Work Safety (Order No.15 and Order No.77 of the former State Administration of Work Safety), and according to the provisions of Item (1) of Article 45 of the Measures for Administrative Punishment of Violations of Work Safety (Order No.15 and Order No.77 of the former State Administration of Work Safety), it is suggested to impose a fine of 20,000 yuan (20,000 yuan).

4. Chuzhou key project construction management office failed to seriously fulfill the owner’s responsibility of unified coordination and management of production safety; It is responsible for the management of accidents by neglecting the performance of key positions of all parties involved in the project and the hidden dangers such as temporary power consumption on the construction site. It is suggested that it be ordered to make a profound written inspection to the municipal government. 

(4) Other suggestions

It is suggested that the relevant units and individuals involved in the construction of this project who have not applied for the construction permit and illegally entered the site should be handled by the Municipal Bureau of Urban Administration and Law Enforcement according to the law.

VIII. Preventive Measures and Suggestions


The lessons of this accident are extremely profound. In order to effectively prevent and contain the accident, it is suggested that the following preventive measures should be taken:


(a) the consortium leader and participating units should strictly implement the main responsibility for production safety, establish and improve the responsibility system for production safety for all employees, and implement the responsibility for production safety at all levels; Strengthen the safety education and training of employees, focusing on the study and training of rules and regulations and operating procedures, enhancing employees’ safety awareness and self-prevention ability, and putting an end to "three violations"; Complete the on-site safety management personnel, strengthen the safety management of the construction site and operation teams, intensify the investigation and management of on-site hidden dangers, eliminate the blind spots and dead corners of safety management, and effectively improve the level of safety production management.


(II) The supervision unit shall carry out supervision in strict accordance with relevant laws, regulations and mandatory engineering standards, earnestly perform supervision duties, and timely require the construction unit to immediately rectify and implement closed-loop management if potential safety accidents are found in the supervision process.


(three) the construction unit should strictly implement the responsibility of the employer for safety production management, standardize the project construction procedures, equip the necessary safety management personnel, and strictly manage the construction contract and project construction process to ensure the safe operation of the construction project; It is necessary to urge the responsible subjects of all parties involved in the construction to conscientiously perform their duties of safety production management and prevent the recurrence of production safety accidents.


(4) The competent departments of relevant industries should strengthen the supervision and management of safety production of construction projects in accordance with the provisions of the Law on Safety Production, which stipulates that "safety must be managed in the industry, business, production and operation", and urge construction, construction, supervision and other contractors to strictly implement the main responsibility of safety production and strictly implement laws, regulations, rules and mandatory standards for engineering construction; It is necessary to standardize the order of the construction market, strengthen the supervision and inspection on the quality and safety of the whole process of engineering construction, strengthen the supervision and management of various construction behaviors of construction, construction, supervision, labor subcontracting and other units, urge relevant units to strictly fulfill the legal procedures for construction projects, standardize all administrative examination and approval procedures for projects as soon as possible, strengthen management, and put an end to the behavior of building without approval and approving while building to ensure the safety of engineering projects. 



 


                                                          "July 14th, 2021" electric shock accident investigation team of the third phase project of Longpanhe Park in Chuzhou City.


                                                                                                                                        September 14th, 2021


(Note: The relevant private information has been dealt with in this public version)


In 2025, Spring Festival travel rush’s total travel volume and single-day peak value from January 14 to February 22 may hit a record high.

  On December 27th, it was learned from the press conference of the State Council Office that in 2025, Spring Festival travel rush will last for 40 days from January 14th to February 22nd. The Ministry of Transport predicts that with the release of policies by all parties, the demand for travel in Spring Festival travel rush will be stronger in 2025, and the total amount of travel and the peak value of a single day may reach a record high. To this end, the Ministry of Transport has taken the lead in setting up a special class for comprehensive transportation in Spring Festival travel rush, striving to achieve the goal of "Safe Spring Festival travel rush, Warm Spring Festival travel rush and Convenient Spring Festival travel rush".

  At the same time, at the end of the year and the beginning of the year, Li Yang, vice minister of the Ministry of Transport, also published the report card of traffic work in 2024, expressing that he was "very proud, excited and full of confidence" in his achievements.

  Talking about the source of confidence in the development of the transportation industry, Li Yang pointed out that one of them stems from the endogenous power generated by huge demand. Looking back at Spring Festival travel rush in 2024, the cross-regional mobility reached 8.4 billion person-times. The number of people traveling in the 7 days of the National Day holiday reached 2 billion, especially on the first day of the National Day holiday, the travel data reached a new high: the total number of people traveling reached a peak of 330 million on October 1; Railway passenger traffic reached 21.44 million passengers, a single-day high; The traffic volume of expressways reached 68.41 million, of which new energy vehicles accounted for 15.9%. The strong travel demand injected strong impetus into traffic development.

  The second is a stronger foundation for development. China’s comprehensive three-dimensional transportation network has reached a new level, with a mileage of 6 million kilometers. Major projects such as the Shenzhen-China Passage are completed and put into operation. Civil aviation is expected to add five certified civil transport airports, with a railway mileage exceeding 160,000 kilometers, including 46,000 kilometers for high-speed railways, about 50,000 kilometers for new highways and 8,000 kilometers for newly rebuilt and expanded expressways. There has also been a major breakthrough in international transportation channels, such as trans-Caspian transportation corridor, direct highway transportation and the opening of Qiankai Port in Peru, opening up new routes for China-Europe and China-Latin America trade.

  The third is full of development potential. A series of economic incremental policies have continuously released the traffic dividend, and the policies of "duality" and "two innovations" have continued to be effective. In November, the growth rate of freight volume and port cargo throughput increased, accelerating by 4.2% and 3.7% respectively year-on-year, which has saved enough stamina for subsequent development and continuously promoted the steady progress of the transportation industry.

  Looking forward to 2025, Li Yang believes that there are challenges and opportunities, and the opportunities outweigh the challenges. On the one hand, hold the policy "baton" and promote the construction of major projects. The list of major projects in 2025 has been drawn up, and the Pinglu Canal under construction, Shanghai Port Xiaoyangshan North Container Terminal, Shanghai-Chongqing-Rongjiang high-speed railway and other projects are speeding up the weaving of the national comprehensive three-dimensional transportation network.

  Furthermore, give full play to the advantages of comprehensive transportation to help reduce costs and increase efficiency. It is estimated that in 2025, it is expected to reduce the logistics cost of the whole society by 300 billion yuan, providing solid support for the real economy, especially the manufacturing industry. It will also deepen the reform of the comprehensive transportation system, promote the reform of the railway system, accelerate the development of general aviation and low-altitude economy, and release the vitality of development through reform.

  In addition, pay close attention to safety production and let people travel with peace of mind. In 2025, Spring Festival travel rush will carry out two nationwide investigations and rectification of potential safety hazards before and after May Day. For the Spring Festival, May Day and National Day holidays, "30 hard measures" were adopted to improve holiday safety with stricter standards. (Wu Na)

How to increase the limit of online bank transfer?

In today’s digital financial era, online bank transfer has become one of the important ways of people’s daily capital transactions. However, sometimes the bank’s default online bank transfer limit may not meet the needs of individuals or enterprises. So, how to increase the online bank transfer limit?

First of all, it needs to be clear that different banks may have different regulations and procedures for increasing the online bank transfer limit. But generally speaking, the following methods are more common:

Go to the bank counter: this is a more direct and effective way. Bring your valid ID card and bank card, go to the bank’s business outlets and apply to the staff to increase the online bank transfer limit. The staff will evaluate your account, credit history and other factors, and handle the corresponding procedures for you.

Apply through online banking or mobile banking: Some banks provide the function of online application to increase the transfer limit. You can log in to online banking or mobile banking, look for options such as "transfer limit adjustment" in relevant settings or service pages, and follow the system prompts. Generally, you need to fill in some necessary information, such as your identity information, contact information, and the amount of the limit you are applying for.

Upgrade the level of bank accounts: Some banks will classify their accounts into different levels according to the customer’s account activity, capital scale and other factors, and different levels of accounts will enjoy different transfer limits. By increasing the capital flow of the account and handling more financial services, the account level will be upgraded, so as to obtain a higher transfer limit.

Provide relevant supporting materials: If your transfer demand is large, the bank may ask you to provide relevant supporting materials, such as income certificate and transaction contract, to prove the rationality and necessity of increasing your transfer limit.

Let’s take the transfer limit adjustment method of a bank and another bank as an example to make a simple comparison for you:

Bank name Adjustment mode Required materials Processing time A bank Counter handling and online banking application Id card, bank card and proof of income (if necessary) Counter processing takes effect immediately, and online banking application takes 1-3 working days. Another bank Counter handling, mobile banking application ID card, bank card and transaction contract (if necessary) Counter processing takes effect immediately, and mobile banking application takes 2 working days.

It should be noted that in the process of increasing the online bank transfer limit of banks, it is necessary to ensure the security of their own accounts and not to disclose account information and passwords at will. At the same time, rationally plan the use of funds to avoid potential risks caused by excessive transfer limit.

In short, to improve the online bank transfer limit of banks, it is necessary to choose the appropriate method according to the bank’s regulations and its own actual situation, and operate according to the corresponding process. I hope the above contents are helpful to you.

(Editor in charge: difference extension)

[Disclaimer] This article only represents the author’s own views and has nothing to do with Hexun. Hexun.com is neutral about the statements and opinions in this article, and does not provide any express or implied guarantee for the accuracy, reliability or completeness of the contents. Readers are requested for reference only, and please take full responsibility. Email: news_center@staff.hexun.com.

He Chaofeng and Liang Anqi held a general meeting of shareholders to observe a minute’s silence for the gambling king.

Su Shuhui, Liang Anqi, He Chaofeng, Huo Zhenting

Su Shuhui, Liang Anqi, He Chaofeng, Huo Zhenting

     According to Hong Kong media reports, SJM Holdings held its annual general meeting on Tuesday (9th). It is reported that there was a minute’s silence for the founder "Gambling King" Stanley Ho, but it did not accept any questions from shareholders. After the meeting, the management met with the media, and the impact of Ho’s death on the company became the focus of questioning.

  He Chaofeng, the second daughter of Hejia Fannie and Freddie and the chairman of the company, has repeatedly stressed that everyone is reluctant to part with his father’s death, but he quit the management of the company as early as 2018, and the current management has been satisfied with the operation. When asked about the results of the re-election of the company’s directors, she pointed out that the votes were still being counted, but she believed that herself, co-chairman Huo Zhenting, Si Tai Liang Anqi and vice chairman Su Shuhui would remain in office, and that there would be no major changes in the board of directors.

  In fact, SJM announced that Chairman He Chaofeng was appointed as the authorized representative of the company, effective from June 10th. In addition, the company also announced that Wu Zhicheng was transferred from an executive director to a non-executive director and retired as the operating president and authorized representative, which also took effect on June 10. The company also announced the voting results of the annual general meeting of shareholders, and all resolutions were passed. Including the re-election of He Chaofeng, Huo Zhenting, Liang Anqi and Su Shuhui as executive directors, were all passed by more than 96% of the votes.

  Asked why the executive director "San Tai" Chen Wanzhen was not present today? He Chaofeng said: "Dr. Chen (Chen Wanzhen) can’t come today."

  As for the death of the gambling king, will the company apply to the government to postpone the renewal of gambling cards? She said that whether the application for gambling cards should be delayed depends on the arrangement of the Macao government, and the company will cooperate.

  In addition, the media are also concerned about the operation of Macao’s gambling industry this year. Su Shuhui said that "everyone lost money in the first half of the year", and now it is the worst. In the second half of the year, I hope that Macao’s customs clearance will restore business. He bluntly said, "This year is not very optimistic, and I hope there will be a rebound next year." The turnover so far this year is equal to 1/10 of last year. He Chaofeng added that at present, the number of tables returning to work is half.

  In addition, when will the company’s new project be opened in Portugal? He Chaofeng said that the project has been completed, but the company did not stop applying for the required business license despite the epidemic, so the leading power lies with the Macao government. She hopes that the project can be opened after the travel restrictions are relaxed.

  Liang Anqi added that the recruitment of this project has been in progress. This includes recruiting new graduates.

  Regarding the arrangement of the company’s satellite casino, He Chaofeng said that there is no conflict between the satellite casino and the new project, and it should continue to follow the previous practice.

Gather popularity, promote consumption, and boost confidence. All kinds of Spring Festival activities are wonderful and joyful.

CCTV News:On the afternoon of January 18th, the Ministry of Commerce held a regular press conference. According to the spokesperson, the "2024 National Online New Year Festival" kicked off on January 18 and the event will last until February 17.

According to the Ministry of Commerce, digital, healthy and green are the new trends of consumption, and they are also the main new ideas of local activities. Around digital consumption, Beijing and other places held the first show of computer, communication and consumer electronic products, the "Science and Technology New Year Festival" and other activities. Around healthy consumption, Shanghai and other places hold "super holidays" and other activities in response to the seasonal demand in winter. Around green consumption, all localities have guided e-commerce enterprises to strengthen the supply of "small dishes", issued green packaging initiatives, and advocated a green and environmentally friendly lifestyle.

He Yadong, spokesman of the Ministry of Commerce:Closely following the needs of the New Year Festival, we will carry out three major "Spring Festival Rejuvenation" promotional activities. Around the rejuvenation of the home, Tianjin and other places carried out activities such as live broadcast of furniture and home appliances and special sales subsidies. Around the rejuvenation of the national tide, Zhejiang and other places carried out activities such as the "Non-legacy New Year Festival" and launched more domestic "tidal products". Around the scene rejuvenation, Shaanxi and other places carried out activities such as "Night Chang ‘an Chao Chang ‘an" to enhance the consumer experience in all aspects.

National Development and Reform Commission: Launching the "Consumer Help for the Spring Festival Action" in 2024

The National Development and Reform Commission (NDRC) recently launched the "Consumer Assistance for the New Year Action" in 2024, mobilizing and calling on organs at all levels, enterprises and institutions, social organizations and the general public to actively participate in holiday consumption assistance, and actively purchasing various products and cultural tourism services in underdeveloped areas such as poverty-stricken areas under the premise of fully respecting market rules.

In 2024, in the "Action of Consumption Helping the Spring Festival", all relevant regions and departments should increase the consumption and purchase of characteristic agricultural products in underdeveloped areas such as poverty-stricken areas, encourage them to go to poverty-stricken areas to carry out county-level cultural tourism consumption, and continue to strengthen the sales and assistance of products and services in poverty-stricken areas, especially in "three districts and three States", key counties for national rural revitalization, and relocation and resettlement areas.

Do a good job in organizing the supply of characteristic agricultural products in underdeveloped areas, smooth the passage from mountain to city, strengthen the control of product quality, and further increase the proportion of market-oriented help and sales.

In 2022 and 2023, in the "Consumer Help the Spring Festival Action", the total amount of sales assistance from various regions and departments reached 170 billion yuan, which effectively improved the income level of people out of poverty, promoted the development of characteristic industries and product upgrading in underdeveloped areas, and promoted the sustained recovery and expansion of domestic consumption.

Ministry of Culture and Tourism: Carry out the cultural tourism activities of "Happy New Year" throughout the country.

The reporter learned from the Ministry of Culture and Tourism on January 18th that during the Spring Festival, the Ministry of Culture and Tourism will organize the theme cultural and tourism activities of "Happy New Year" in 2024. The activities cover many fields such as Huimin’s cultural performances, intangible experience display, tourism and leisure consumption, and enrich people’s holiday life.

It is understood that the theme culture and tourism activities of the 2024 Spring Festival of "Happy New Year" were carried out from January 18 to March 11. This activity covers many fields such as public service activities, non-legacy experience display, tourism and leisure consumption, ice and snow research and tourism.

The theme activity of "Colorful Study Tour to China" is jointly participated by 11 provinces including Yunnan, Shandong, Zhejiang, Anhui and Jiangxi. Yunnan will launch a series of research activities such as "exploring biodiversity"; Jiangxi will launch the activity of "Traveling with Poetry in Jiangxi"; Protecting the beautiful Yangtze River theme research tourism activities, with the participation of provinces along the main stream of the Yangtze River; Shanghai will launch a "century-old civilization, butterfly changes into a new life — — Industrial research opens the next wonderful event; Hubei will launch a series of research theme activities such as "telling the epic of the red soul" and "welcoming the New Year without leaving behind"; The "ice and snow theme research tourism activities" are mainly concentrated in Heilongjiang and Jilin.

In addition, during the Spring Festival, the Ministry of Culture and Tourism will also launch the "100 Cities and 100 Districts" financial support consumption action plan, covering the whole chain of "eating, living, traveling, buying and entertaining", so that people can benefit and enterprises can really benefit.

Financial war "epidemic", monetary policy in action! More than 2,600 enterprises have obtained preferential interest rate loans exceeding 100 billion yuan.

  Since the outbreak of the COVID-19 epidemic, the whole country has been engaged in the "epidemic". As the blood of the real economy, finance also plays a "strong backing" function, providing "blood transfusion and oxygen supply" for fighting the epidemic and resuming production. Among them, the central bank launched a special refinancing policy at the end of January, providing a total of 300 billion yuan of low-cost special refinancing funds to nine national banks and some local corporate banks in 10 key provinces (cities) such as Hubei, and supporting financial institutions to provide preferential interest rate loans to key enterprises responding to the epidemic, so as to accurately support the supply of key materials and daily necessities for epidemic prevention and control.

  Due to the favorable interest rate of special refinancing, the central bank requires financial institutions to provide loans to enterprises on the list at preferential interest rates. The upper limit of interest rate is the latest published one-year loan market quotation rate (LPR) minus 100 basis points, which is currently 3.05%, and encourages financial institutions to provide loans at lower interest rates. In addition, the Ministry of Finance will give 50% discount to key enterprises according to the actual interest rate of loans to ensure that the actual financing cost of enterprises falls below 1.6%.

  Up to now, it has been one month since the introduction of the special refinancing policy. What is the implementation of the policy?

  According to the data learned by the reporter from the central bank, as of March 2, financial institutions used special refinancing to issue loans of 117.3 billion yuan to 2,674 listed enterprises, with a weighted average interest rate of 2.57%, which realized the effective transmission of preferential interest rates to key enterprises. Among them, 9 national banks issued loans of 69.9 billion yuan to 1232 national key enterprises, with a weighted average interest rate of 2.43%; Local corporate banks and six national banks issued loans of 47.3 billion yuan to 1442 local key enterprises, with a weighted average interest rate of 2.79%.

  The industry generally believes that the special refinancing policy accurately and quickly supports financial institutions to expand credit supply to key enterprises in epidemic prevention and control, which is of great significance for key enterprises to start work and resume production as soon as possible, and meet the financial needs of epidemic prevention and control as soon as possible. It is an important measure for monetary policy to take the initiative and respond positively and support winning the epidemic prevention and control war.

  As an innovative structural monetary policy tool, the special re-lending policy embodies the word "accuracy" in the way of fund distribution and management, and strengthens the fund guarantee for key enterprises.

  In terms of capital investment management, the People’s Bank of China implements the list management of key enterprises to ensure that special refinancing is accurately invested in front-line enterprises that directly support epidemic prevention. Key enterprises include enterprises that produce, transport and sell key medical prevention and control materials and daily necessities, such as enterprises that produce medical masks, medical goggles, sterilizers, disinfectant and other products to deal with the epidemic. Specifically, it includes two categories. One is the national key enterprise, which is determined by the National Development and Reform Commission and the Ministry of Industry and Information Technology; Second, local key enterprises are determined by the provincial governments of key provinces (cities).

  In the way of fund distribution, the reimbursement system of "loan first and then borrow" is adopted for special refinancing. Financial institutions first issue loans that meet the requirements to key enterprises, and then apply to the People’s Bank for special refinancing, ensuring that the special refinancing funds are invested more accurately. In terms of the progress of fund distribution, the central bank issued special re-loans to banks on a weekly basis, and the first batch of special re-loans was issued on February 10. As of March 4, the People’s Bank of China issued a special refinancing loan of 184 billion yuan as the initial fund to promote financial institutions to issue preferential interest rate loans quickly.

  In the face of epidemic, time is life. Liu Guoqiang, deputy governor of the People’s Bank of China, previously requested that financial institutions should, in principle, issue loans in place within one day or at most two days after obtaining the list of enterprises. From the practice of financial institutions, banks generally open green channels, simplify the examination and approval process, and organize loans efficiently, among which the fastest one can complete the capital investment in only 8 hours.

  In the key areas of the epidemic, the policy has already taken the lead in landing quickly. Wuhan Branch of the People’s Bank of China has designated Hubei Bank, Hankou Bank and Wuhan Rural Commercial Bank as special refinancing targets, and established a rapid approval mechanism for special refinancing and a daily loan issuance system, which has effectively met the capital needs of 123 key enterprises in Hubei epidemic prevention and control. For example, the Three Gorges Branch of ICBC issued a one-year loan of 200 million yuan to Ogilvy & Mather Medical Products Company with an interest rate of 3.15% to support enterprises to expand production and make full efforts to make medical protective masks. Guangzhou Branch of the People’s Bank of China will speed up the issuance of special refinancing loans, and realize the same-day application, the same-day approval and the same-day receipt. Hangzhou Branch of the People’s Bank of China urged financial institutions to fully cover the capital needs of key enterprises and support them one by one.

  Special refinancing has a large number and low price, which is emergency money and life-saving money. How to balance efficiency and safety and ensure that "good steel is used in the cutting edge"?

  In this regard, in addition to the role of the enterprise list system as the first pass, financial institutions should also ensure the issuance of preferential loans. The People’s Bank of China requires financial institutions to strictly examine and approve and issue loans quickly, and the purpose of loans should comply with the relevant provisions of the People’s Bank of China, so as to ensure that special refinancing funds are used for the production and business activities needed by key enterprises to prevent and control the epidemic situation at the first time. At the same time, the People’s Bank of China requires financial institutions to establish electronic ledgers and track and check the use of funds. In addition, the Audit Commission also strengthened follow-up supervision on the use of special refinancing funds to prevent the funds from "leaking". (Reporter Li Guohui correspondent Song Wei)

Does New Year’s Eve refer specifically to New Year’s Eve? Today’s ant manor answer

  Does New Year’s Eve refer specifically to New Year’s Eve? This is the question in today’s classroom of Ant Manor on January 31st, 2022. Here is a detailed introduction to the chicken feed answer in today’s classroom of Ant Manor on January 31st, 2022.

Does New Year's Eve refer specifically to New Year's Eve? Today's ant manor answer

  Ant Manor is very fun. You can do charity while raising chickens, and you can get chicken feed for free while improving your knowledge.

  The latest news from Minnan. com (www.mnw.cn), the question in today’s Ant Manor class is:

  Does New Year’s Eve refer specifically to New Year’s Eve?

  What are you thinking? It must be.

  No

  Answer: No.

  Analysis:"New Year’s Eve" refers to the last night at the end of the year, not just the New Year’s Eve. The Chinese lunar calendar was compiled by the ancients according to the change of the moon’s round and round, so there are big and small months, the big month is 30 days and the small month is 29 days. This year’s twelfth lunar month coincides with the small moon, only 29 days, so there is no New Year’s Eve.

  These are the answers to the questions in the classroom of Ant Manor on January 31st, 2022.

Editor in charge: Zeng Shaolin

Cities such as Beishangguangshen and Shenzhen are clear: commercial projects may not be changed to residential housing without authorization.

  BEIJING, Beijing, May 17 (Zhongqing) Following Beijing, hot cities such as Guangzhou, Shanghai and Shenzhen have successively introduced property market regulation measures for commercial projects. Although the intensity of control is different, it is clear that commercial projects should not be linked to residential properties, and some cities have also explored control methods in architecture and design, trying to reduce the possibility of commercial projects turning to residential uses from the product development end.

  After Beijing, Shanghai, Shenzhen and other places followed up to regulate the commercial market.

  On March 26th, Beijing Municipal Commission of Housing and Urban-Rural Development issued a document to regulate the commercial market, saying that "commercial and office projects (hereinafter referred to as commercial projects) should be developed, constructed, sold and used in strict accordance with the planned purposes, and may not be changed to residential purposes without approval", completely changing the rules of the commercial market.

  The above-mentioned policies in Beijing not only block the channels for individuals to buy projects that have not been built, are under construction or are being sold, but also set strict thresholds for individuals to buy second-hand commercial houses.

  Four days later, Guangzhou proposed to strengthen the management of commercial real estate projects. "Real estate development enterprise vendors do property, the sales target should be a legal entity; The commercial property purchased by a legal entity shall not be used as a residence, and when it is transferred again, it shall be transferred to the legal entity. "

  On April 21st, many departments in Chengdu jointly issued the Notice on Further Strengthening the Management of Commercial and Office Construction Projects, requiring commercial and office construction projects to be developed, constructed, sold and used in strict accordance with the nature of planned land and planning permission, and it is strictly forbidden to change them into residential purposes without authorization.

  On the same day, Shanghai required that the land transfer contract should specify that office land should not be used for apartment-style office projects, and commercial land should not be used for apartment-style hotels without agreement.

  On May 12th, Shenzhen also issued a document to restrict the transformation of commercial offices. In the next five years, the transformation of commercial offices, R&D buildings into apartments, stealing areas and rebuilding will be strictly restricted. "After the introduction of the New Deal, such facilities will serve more office needs, that is, they are unlikely to serve the needs of housing." Yan Yuejin, research director of the think tank center of Yiju Research Institute, said that this has a negative effect on the subsequent Shenzhen commercial projects.

  So far, Beijing, Shanghai, Guangzhou, Shenzhen, Chengdu and other cities have implemented control policies for commercial projects. From the perspective of urban types, they are basically concentrated in first-tier cities and some hot-spot second-tier cities.

  Product design of multi-city document management and control returning to commercial attributes

  No matter from the length of policy content, release time and follow-up supporting measures, Beijing has the strictest control over commercial projects.

  "In the more than one month after March 26th, the actual transaction in the commercial market in Beijing fell sharply." Zhang Dawei, chief analyst of Zhongyuan Real Estate, bluntly said that it is the strictest commercial purchase restriction policy in history, which has dealt a significant blow to the overheated commercial market.

  According to the policy of multi-site business regulation, it is a basic principle not to change it to residential use without authorization. For real estate development enterprises that change commercial real estate projects into residential purposes in violation of the plan, they all take a firm attitude of "once verified and dealt with seriously".

  On the other hand, there are also differences in the intensity of regulation. Except for Beijing, other cities have not explicitly restricted individual commercial loan purchasers from running projects. Shenzhen, Chengdu and other places focus on product design control at the supply end.

  For the development enterprises, the minimum division unit of newly-reported commercial projects is strictly regulated as not less than 500 square meters in Beijing, not less than 300 square meters in Guangzhou, and only part of the proportion is required in Shenzhen. In terms of transfer, Beijing and Guangzhou stipulate that purchased commercial properties can be transferred to legal entities and individuals, but Guangzhou has set "additional conditions" for the transfer, that is, individuals can not transfer again until they have obtained the immovable property certificate for two years.

  Why is it limited? Crack down on speculation and limit the influx of people

  "The activity of commercial projects is mainly due to the restriction on the purchase of houses and the high-end of houses, so a large number of public buildings are supported in the residential land." Speaking of the heat of the commercial market, Zhang Dawei believes that it has something to do with the increase in population.

  Zhang Dawei said that in first-tier cities such as Beijing and Shanghai, the demand for permanent residents’ housing is huge. Some projects in the name of commerce, hotels and offices, by dividing property rights, change the use attributes of commercial projects, take "quasi-housing" as a selling point, and play a marginal role in electricity and water use to attract buyers.

  However, due to the different nature of land use, there are obvious differences between commercial projects and commercial housing. First of all, the property right is 40 or 50 years, and there is no residential facilities (school district houses, etc.), with high residential density and small apartment type; The most important thing is that the house price will be lowered by 50-60% compared with the price of commercial housing in the same region.

  "Low housing prices and no purchase restrictions are the main reasons for choosing commercial projects." Many interviewees who have purchased commercial projects told the reporter of Zhongxin. com.

  Why should we regulate the commercial market? "The first is the planning problem. The business that is originally a residential facility has the property of residence, which is contrary to the planning and the related facilities cannot be followed up; The other is the population problem, such as the large population of commercial projects in Beijing and Shenzhen; In addition, due to the low land price of commercial land, developers take land with commercial land but sell it at residential prices, earning extra profits in disguise. " Zhang Dawei said.

  Hua Zheng, an associate professor in the Department of Land Management, School of Public Administration, Renmin University of China, pointed out in an interview with the media that commercial regulation will ensure that residential houses and commercial offices belong to commercial offices, reduce the customer base of commercial properties, reduce the enthusiasm of developers and investors to run products, and then reduce the premium level of commercial land. "Cracking down on speculation in the commercial market will also limit the disorderly influx of population into big cities to a certain extent".

  It’s not over! More cities may be planning to standardize the business market.

  "There are cities that are brewing or starting to set off a new round of blockades ‘ Business changes to residence ’ 、‘ Do change and live ’ The policy tide. " Zhang Dawei predicted that before, the investment demand for buying commercial projects due to residential purchase restriction may face great risks.

  Yan Yuejin, who predicted that Shenzhen and Shanghai would follow up the regulation of commercial projects, told reporters that in the future, some hot cities will actively follow up the purchase restriction of commercial projects. Although the intensity of control will not be equal to that of Beijing, one thing is certain: "Commercial projects are no longer linked to residential properties."

  In Yan Yuejin’s view, in terms of policy strength, the measures to directly restrict or prohibit sales represented by Beijing are the most severe, and the control effect is the most obvious; However, the following mainstream model may be to standardize the supply side and actively control product design.

  "Beijing and Guangzhou will not rule out the formulation of new policies for existing properties, for example, reasonable guidance for some buyers who sell and transfer houses." Some insiders analyzed to reporters. (End)

Central Radio and Television General Station released the main visual image of the 2022 Spring Festival Gala.

  The Spring Festival of the Year of the Tiger is coming to us, and the flavor of the Year is getting stronger and stronger. On January 15th, CCTV released the main visual image of the 2022 Spring Festival Gala. The main visual image consists of a Tiggo and the words "2022" and "Spring Festival Gala of CCTV", and the overall color is mainly red and golden yellow, which highlights the festive and heavy traditional festivals. Mr. Chen Xiangbo, vice chairman of Guangdong Artists Association and chairman of Shenzhen Artists Association, specially designed the image of a cute tiger for the 2022 Spring Festival Evening of the reception desk as the logo of this year’s Spring Festival Evening.

  The Spring Festival Gala in 2022 is under intense preparation. The gala will highlight the main tone of "happiness, auspiciousness and jubilation", adhere to the principle of "keeping integrity, innovating and making new achievements", enthusiastically depict the grand atmosphere of the new era and new journey in the festive atmosphere, and present a "reunion, reunion and unity" for the global audience.

Baodao is still sharp. 7.1mm dual-core motorcycle RAZR depth evaluation

    Write something unrelated to the evaluation before the evaluation.


    Mr. Fujiko F Buxiong, the author of Doraemon, which I loved most when I was a child, died unfortunately before the cartoon ended, leaving an unresolved ending. Among the numerous supplementary endings of later generations, one of my favorite endings is that the robot cat suddenly got sick one day and didn’t have time to repair it, so it silently bid farewell to Nobita. After a period of decadence and depression without robot cats, Daxiong began to study hard, and returned after graduating from Ph.D., finally being able to repair the robot cats. The first sentence after the robot cat opened its eyes was: "Daxiong, I have been waiting for you for a long time."


    Yes, I have been waiting for you for a long time.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
I’ve been waiting for you for a long time, RAZR


    Since the first generation of RAZR”V3, it has been destined to become a classic. Although it began to enter the quagmire of design after V3, it entered the most difficult time. However, from the beginning of the system, the former Motorola began to return strongly, and the former classics finally shone the most brilliantly in generate today. On October 19th, Motorola and Verizon held a press conference, which officially debuted. The thickness of 7.1 mm once again became the focus of attention in the Android market.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
RAZR depth evaluation of 7.1mm motorcycle with sharp blade


    RAZR blade series returns again.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Let’s look at the thickness of RAZR.


    When the author got this brand-new RAZR blade, its appearance was completely different from that of that year: Android2.3 system, 4.3-inch qHD resolution Super AMOLED Advanced screen, 1.2GHz dual-core and Cabra back coating. When these elements are combined together, we can see that several years of snow storage has made RAZR Blade have a deeper transformation, and it has become stronger and will become stronger.



7.1 mm unusually amazing thickness


    RAZR, like his nickname "Blade", has an unimaginable fuselage thickness of 7.1 mm. Although this is only the thinnest part of its fuselage, the thickness of most parts of its fuselage is controlled at around 7.3 mm, even this can’t stop Motorola RAZR from becoming one of the thinnest fuselage.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Ultra-thin blade design RAZR




video


    Although the thickness of Motorola RAZR fuselage is controlled at about 7.3 mm in most places, there is still a large protrusion at the top of its fuselage. This design is mainly because of the camera that supports 1080P full HD camera.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
MOTO RAZR


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Bottom Mic


    In addition to the 7.1 mm fuselage and 8 megapixel camera, we also found that the configuration of the fuselage interface is also extremely complete. The 3.5 mm interface on the top of the fuselage, the MicroUSB data interface and the video output interface of the mini HDMI are lined up. Of course, because Droid Razr locates the flagship, it also supports WebTop 2.0 extension.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Side Micro-SIM card slot and Micro slot


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Profile close-up


    Another thing worth noting is that the Droid Razr uses an integrated design, so the MicroSD card slot and the Micro SIM card slot that first appeared on the MOTO machine are set on the side of the fuselage and protected by a dust cover.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Profile close-up



Kevlar bulletproof armor on the back


    On the back of the whole fuselage, we can see a layer of material that is neither metal nor plastic. This is our unique secret: Kevlar coating. This layer with a thickness of only 0.3 mm is five times stronger than stainless steel. This time, Motorola introduced Kevlar material into Andorid and became a leader among ultra-thin materials.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Kevlar coating on back


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Top blue shark design


    Originally named KEVLAR in English, it is also translated as Kevlar. It is the trade name of an aramid fiber material developed by Dupont Company in the United States. The original name of the material is "poly (p-phenylene terephthalamide)", which plays a great role in the military. It is widely used in anti-missile coating of armored vehicles and tanks. With the progress of science and technology, Kevlar has also achieved good results in civil use. The entire back of Motorola RAZR is coated with Kevlar, which ensures toughness and obtains a very good feel. 


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Top HDMI interface


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Back design


    It is said that the design of Motorola RAZR is inspired by the concept sports car, and the streamlined appearance and super-strong materials have created the glory of this RAZR. Compared with the previous aviation grade aluminum alloy material of V3, this RAZR has gone further in technology.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Motorola RAZR


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Motorola RAZR and thickness comparison



Nanotechnology SuperAMOLED Advanced Screen


    For now, the attraction of hardware to consumers has far surpassed itself and the charm it brings. Of course, it may not be suitable for this Razr in our hands. After all, the 7.1 mm body and the use of Kevlar bulletproof fiber have a great impact, but it at least shows that hardware configuration plays a vital role in the success of a mobile phone. Therefore, we can see that although Razr has a very distinctive appearance, it is also painstaking in terms of hardware configuration. Although the author has not been in contact with this model for a long time like everyone else, it is easy to summarize the following characteristics for everyone. See if these characteristics can strengthen your determination to buy.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade


1. Super AMOLED Advanced screen with qHD resolution (expectation index: 7/10)
2. Gorilla scratch-resistant glass (expectation index: 6/10)
3. TiOAMP 4460 1.2 GHz Cortex-Duocore+PowerVR SGX 540 (expectation index: 8/10)
4. LPDDR2 RAM (expectation index: 5/10)
5. Bluetooth 4.0 with BLE+EDR (expectation index: 10/10)
6. Our camera supports 1080P shooting (expectation index: 8/10).


    In short, although Razr has no obvious advantages in hardware configuration, its skill in some details is enough to conquer the demanding requirements of most users. If you don’t believe it, please follow the author’s steps.


Super AMOLED Advanced screen


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Corning gorilla scratch-proof glass


    Although qHD(960×540), a special resolution, was first used in the field of Android, and the screen performance of large-screen mobile phones was further improved, but a good breakthrough has not been found in the screen material. However, as the main competitors in the industry,,, and have repeatedly used SLCD, Super AMOLED series, BRAVIA, ASV and IPS to attract the attention of the audience. Consumers also hope that MOTO products can make a breakthrough in the selection of screen materials. TFT, a more traditional technology, obviously no longer meets people’s positioning for high-end smart phones.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Screen display effect


    Therefore, we saw that MOTO finally used a kind of Super AMOLED Advanced on their latest Razr. Although it is the first time for me to hear about this kind of screen, combined with my own feelings and the powerful Internet, I summarized the following characteristics for the majority of netizens.


1. The first AMOLED screen with qHD resolution.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Screen display effect


Although there is no evidence to prove that the screen made of AMOLED material has certain restrictions on the resolution, but look at the previous series of products, the resolution of most AMOLED series screens on the market is 800*480. Although this resolution has not affected the sales of Samsung Galaxy series products, it is somewhat unpleasant for consumers who are constantly pursuing perfection.


    Nowadays, with Razr, the resolution of Samsung’s AMOLED series screen has successfully reached the qHD level, and above Razr, it is pixels per inch with 256ppi. Although this screen is not as delicate as Retina level, it is also extremely top-notch in the current market.


2, more power saving


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Super AMOLED Advanced screen


    TFT screen is no longer suitable for the development of the times in terms of response time and thickness, while AMOLED screen is superior to TFT screen in terms of power consumption and color performance because of its self-luminous characteristics. On the Super AMOLED Advanced screen, because the black dots don’t emit light at all, the power consumption is correspondingly much lower.


3: corning gorilla glass encounter AMOLED


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Scratch-proof glass is put in the trouser pocket without pressure.


    It is not the first time that Corning Glass has appeared on MOTO’s mobile phone. The previously popular series and Atrix series all used this hard scratch-resistant and brighter screen. But this is the first time that Corning and Super AMOLED series products are combined. We all know that Super AMOLED series products have removed the touch layer in the screen in order to show brighter colors, so that the glass on the screen surface and the LCD panel are directly bonded together. Therefore, the use of Corning glass protects our LCD panel from damage with a hard "shell", and at the same time, because it is no longer necessary to have a film, the advantages of Super AMOLED in bright colors can be displayed more intuitively in front of users.



Brand new TI OMAP4460



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
TI OMAP 4460 processor


    In order to wholeheartedly create a product that satisfies users, we saw a brand-new SoC from Texas Instruments OMAP4460 on this Razr, and this is the first time that this SoC has appeared on the platform (the highly anticipated Galaxy also uses OMAP4460, but it can only be the second child because of its late release time), so does OMAP4460 have a performance breakthrough compared with the previous OMAP4430 and the powerful Exynos 4210?


It belongs to OMAP4460 with GALAXY Nexus.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Working environment of TI OMAP series products


    First, let’s look at the difference between OMAP4430 and OMAP4460. In fact, OMAP4430 and OMAP4460 both belong to the OMAP4 platform of Texas Instruments, and there is not much difference in technology and architecture. The main difference in performance is that OMAP4430 can only work at the highest frequency of 1GHz, while OMAP4460 can support at the highest frequency of 1.5GHz, which shows that OMAP4460 used on RAZR has been down-converted, but this will not affect our expectations for its performance.


    In addition, the new OMAP4460 also supports 1080P full HD video recording function, so we can see that the words 1080P HD are clearly marked on the camera on the back of the fuselage. At the same time, OMAP4460 also has a dual-channel LP controller, which obviously improves the access efficiency, which is also lacking in other dual-core SoCs.


The problem of fever still needs attention. 


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Kevlar coating can accelerate heat dissipation.


    Although OMAP4460 and previous OMAP4430 belong to the category of smaller chip area in the whole dual-core SoC field, their calorific value at work is easier to control compared with other products, but in the actual use of the author, it is found that Droid RAZR has obvious calorific phenomenon, and this experience is also obvious to some extent because of Razr’s ultra-thin body.


GPU main frequency promotion architecture remains unchanged.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
TI OMAP4460 adopts SGX540 GPU.


    In addition to the lack of calorific value, the PowerVR SGX540 graphics processing chip integrated in OMAP4460 is another place that the author is not satisfied with. Compared with the POWERV SGX543MP2 and Adreno 220 of Qualcomm, it is somewhat outdated, but fortunately, Texas Instruments has improved the default working frequency of POWERV SGX540 from 200MHz to 300MHz, which has brought about a certain performance improvement.



OMAP4460 is the best in performance testing technology.


    I have explained so much about performance in front of you, so we still can’t test the performance for you. The testing tools are still Antutu and Vellamo testing software. However, before the test, the author also made a statement for everyone: because this ZO channel evaluation is an engineering prototype, the performance can not be completely stable. The test is for reference only, and we will bring you the most accurate evaluation data after receiving the official retail version.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
system information


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Vellamo test


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Test details


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Antutu running score


    Antutu mainly evaluates the comprehensive strength of the whole system, while Velamo pays more attention to the performance of JS and HTML5. Antutu scores 5100 points, while Velamo scores 600+, and the overall performance has reached the top level. Of course, at present, because the machine is still an engineering prototype, the performance is only for your reference, but there is no doubt that RAZR has reached the top level in the current ranks.



Casual little surprise Bluetooth 4.0


    I want to say that the most impressive hardware configuration on Razr is Bluetooth 4.0 technology, so I believe many users will cast a disdainful eye, not to mention that this function has not been mentioned too much. But after understanding the corresponding background, I believe everyone will understand the original. Before introducing Bluetooth 4.0, let’s first understand another term-short range communication.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Bluetooth 4.0


    Remote communication or near-field communication refers to short-distance data communication between devices at the same time. At present, RFID and NFC technologies are well known in this field. At the same time, because the power consumption of short-range communication is very small and most of them have the characteristics of authentication-free pairing, they are favored by Google and gradually spread to its leading position. In our daily life, because NFC chip has passive characteristics, it can be easily deployed on any device (for example, the NFC game launched some time ago took advantage of this characteristic). At the same time, as the predecessor of NFC technology, the popularity of RFID radio frequency chip technology has made NFC a hot topic in distance communication technology, and major manufacturers also hope that this not-so-new technology can bring us another change in interaction mode.


    What does Bluetooth technology have to do with these? Compared with the previous Bluetooth versions, they are really not suitable as the main technology of short-range communication, because the authentication mechanism and slow connection speed of Bluetooth make Bluetooth more suitable for high-speed transmission of point-to-point pairs. However, the latest release of Bluetooth 4.0 seems to want to change this situation, because a technology called BLE has been added to Bluetooth 4.0, which greatly reduces the power consumption of Bluetooth, and at the same time provides a short-range communication feature without verification. Of course, the most important thing is to reduce its connection time to 6ms, which makes Bluetooth 4.0 not at a disadvantage in comparison with NFC technology. In addition, the development time and technical maturity of Bluetooth are far stronger than that of NFC, not to mention its strong support (at present, Macbook Air and Bluetooth 4.0 technology are available). I believe that Bluetooth will become the biggest rival of NFC in the popularization of near-field communication technology in the future.


    We can say that with the addition of Bluetooth 4.0 technology, we also have the ability of short-range communication, and at the same time, with the vigorous promotion of Apple, this technology will get more attention in the future.



New UI for Android2.3.6


    RAZR was released before the well-known 4.0, but the breakthrough in the system is not so obvious except for the industrial design and hardware configuration. Of course, this is mainly because this mobile phone does not use the latest Android 4.0 system, but as long as we use it well, we can really find that we have added a lot of our own unique wisdom to this mobile phone. Let’s take a detailed look at what aspects of MOTO’s wisdom are reflected in.




video


1. A brand-new UI interface



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
UI interface


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Lots of 3D effects


    It is said that the brand-new UI is actually relative to the traditional Android2.3.5, because the UI used by Droid Razr has actually met with everyone on the licensed product. Simply sum up, this brand-new UI has redesigned the layout of the unlocking interface, the brand-new MOTO Widget, richer custom content and the dynamic effect of light and shadow.


2. Applications that can be grouped


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
primary menu


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Group function


    Application files are no strangers to the Android system, but the previous folder is more like a desktop plug-in on everyone’s desktop, and the UI that can really group applications is rare. However, MOTO has done a good job in this respect. After entering the menu, we can see many prefabricated groups by clicking on the application grouping in the upper left corner. At the same time, our users can manually modify the groups according to their own needs, which is very helpful for users to manage their massive applications.


3. Trigger trigger mechanism


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
If "the power is lower than 20%", the command "Turn off WIFI due to brightness reduction" will be triggered.


    A and B are associated conditions, and action B will be executed when condition A sets out, which is the principle of the famous "ifttt" website. It seems that MOTO designers have also been inspired by this model, and the trigger function has been added to Motorola RAZR. For example, we want the mobile phone to turn on wifi, turn off cellular data and automatically reduce the brightness of the screen when it is connected to. We can do this by using the smart assistant and following the settings shown below.



MOTOCAST towards the internet cloud


    With the continuous popularization of the concept of cloud, more and more manufacturers begin to produce and release their own transportation equipment and applications, the most influential of which should be just the announcement of iCloud not long ago. Although iOS is ahead, Google has not officially released its own integrated cloud service of opportunity platform, but as a strong advocate of Android system, it has added a personal cloud service of MOTOCAST to its own. With this service, we can turn our own into Razr cloud, making the mobile phone pass WiFi or access multimedia files in the computer.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
MOTOCAST


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
There is MOTOCAST in the music photo.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
MOTOCAST requires simple registration and installation.


    Different from iCloud, MOTOCAST is a personal cloud application, and all functions will not go into a third-party server, but will be transmitted between personal devices. Whether it’s PC, MAC or mobile phone, MOTOCAST can synchronize all your services together, which is very convenient.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Wireless AP function


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Third party software


    At the same time, RAZR also supports WIFI and 3G networks. It is also very comfortable to browse the web through this 4.3-inch big screen, and there is no pressure on web browsing. At the same time, the machine supports wireless AP function, and it can turn the mobile phone into a wireless hotspot to share the Internet with other devices.



Take 1080P video


    Maybe it’s just a technical problem that PCB can be compressed to 7.1mm.. At that time, it was very difficult to compress the camera to a thickness of 7.1 mm. After all, for me, the precision equipment composed of multiple lenses can’t be too thin, so the 8 megapixel camera is a bit prominent, which makes the whole machine feel a bit like a hammerhead shark.



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
8 megapixel camera


    RAZR has a built-in 8 megapixel camera, which supports 1080P video recording. Let’s take a look at the photo proofs first. The haze in Beijing these days is very serious, which also affects the whole display effect to some extent. But it doesn’t matter, you can still feel the sharpness of RAZR’s photos from the proofs, and the imaging is very clear and the function is quite good.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Photo proof


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Photo proof


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Photo proof


    In addition, we released a 720P (Due to the engineering prototype, there is a temporary problem with 1080P.) video recording samples, everyone can click on the picture.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Click the picture to download.



The blade is still sharp, RAZR is back.


Available:



RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
space available


    I believe no one wants to buy one and install a memory card to use it, so most of the current flagships have built-in capacity. In the official parameters, I see the combination of RAM and 16GB ROM memory, and the user’s disposable capacity is 11.5GB. However, the project and its display are 8GB of space, and basically there is no problem in putting photos and videos.


Standby:


    RAZR has a built-in 1750 mAh battery.However, in order to pursue the ultimate thin and light battery, it is non-detachable., thus affecting the usability to some extent. Specific standby time The author used this product for three hours, and after heavy use, the power dropped by 40%. Therefore, it is estimated that the standby time is about two days. Of course, we will not see the specific test until the retail version is launched.


Time to market:


   In November, it is still uncertain.


Bootloader:


   Locking, which is said to be a compromise made at the request of operators, is still inconclusive.


Andorid4.0:


   Many people ask the author this question, but the official has not given any answer. According to a large number of recent mobile phone upgrades, Android4.0 can definitely be upgraded, but the specific time depends on Motorola’s official statement.


RAZR depth evaluation of dual-core 7.1mm motorcycle with sharp blade
Motorola RAZR


Seven years later, the blade is still sharp.


    In the past seven years, since the first RAZR mobile phone V3, Motorola has had a low ebb and confusion, but it finally survived. When this model uses Kevlar coating, 7.1 mm thickness, 1.2GHz, qHD Super AMOLED screen and Android2.3.6 system, we see that RAZR is re-energized. The blade is still sharp, and we didn’t wait in vain.